Menara Simfoni, Balakong, Selangor
IT Muhibbah Jaya Sdn Bhd successfully completed the full installation and commissioning of a Grounding & Lightning Arrestor System at Menara Simfoni, Jalan Simfoni 2, Balakong, Seri Kembangan, Selangor.
The project involved comprehensive installation of lightning protection conductors along the building rooftop perimeter, establishment of 6 earth chambers in the surrounding ground areas, and thorough earth resistance testing to verify all earthing points meet the required low-resistance safety specifications.
All earthing systems were tested using a Kyoritsu KEW 4105A Digital Earth Tester, with before and after measurements recorded to demonstrate significant improvement in earth resistance values across all 6 chambers — from overload (OL) or high-resistance readings down to less than 1 ohm, confirming a safe and effective installation.
Prepared by: Tharmarajan, IT Muhibbah Jaya Sdn Bhd (1578320-P).
Photographic documentation of the lightning arrestor system installation at Menara Simfoni. Click any photo to view full size.
Earth resistance measured before and after installation using Kyoritsu KEW 4105A Digital Earth Tester. All 6 chambers achieved less than 1Ω after installation.
All 6 earth chambers achieved earth resistance values well below 1 ohm after installation, confirming a safe, effective and compliant grounding system at Menara Simfoni.