Gate Valve Replacement – OUG Parklane

Completion Report

Replacement, Installation &
Testing of Gate Valve

Block E1, E2 & E3, OUG Parklane, Kuala Lumpur

Location
OUG Parklane, 58200 Kuala Lumpur
Completed
12th August 2026
Client
Badan Pengurusan Bersama Block E Parklane OUG
100% Job Done — Completed

Project Overview

IT Muhibbah Jaya Sdn Bhd was commissioned by Badan Pengurusan Bersama Block E Parklane OUG to carry out the replacement of new gate valves at Level 10 and Level 20 located in blocks E1, E2, and E3.

The scope of work involved a comprehensive mechanical overhaul: isolating and depressurizing the pipeline, safely dismantling the old valve cover and pilot assembly, and removing the internal components for detailed inspection.

After thoroughly cleaning the valve body, diaphragm chamber, pilot tubing, and fittings, the new gate valves were installed. The project concluded with full functional testing and commissioning to ensure optimal water pressure regulation and flow safety.

Prepared by: Tharmarajan, IT Muhibbah Jaya Sdn Bhd (1578320-P).

Project Details

Client Badan Pengurusan Bersama Block E Parklane OUG
Location Jalan 1/152, Off Jalan Puchong, Taman OUG Parklane, 58200 Kuala Lumpur
Date 12th August 2026
Category Plumbing & Mechanical
Status ✔ 100% Complete
Prepared Tharmarajan
IT Muhibbah Jaya Sdn Bhd
Documentation

Site Photos & Installation Works

Photographic documentation of the Gate Valve replacement process. Click any photo to view full size.


Dismantling existing faulty gate valve

New gate valve preparation

After replacement of Gate Valve
Back to All Projects

Newsletter Subscription

Get latest news & updates